Most homeowners ask this when researching for kitchen renovation in Bath, and the honest answer has two parts. Your kitchen fitter in Bath can give a realistic estimate before work starts but nobody can give a guarantee, because the true condition of a kitchen only shows once the old one comes out.

A straightforward standard kitchen installation in a typical 3 bed semi in Bath, with no structural changes and no surprises behind the units, will be about a week from strip-out to final snagging. Change the layout, add a wall removal, a kitchen rewire, or new plumbing, and the timeline extends.

What actually sets the schedule

Three things drive how long a kitchen takes, more than any other factor:

Structural work.

Removing a wall or moving a doorway means third party people like building control or structural engineers and that means waiting on inspections at set points, not on our schedule.

What's we uncover once the work starts.

Cabinets and worktops hide the wall and floor behind them. Damp, old lead pipework, or wiring that doesn't meet current regs only becomes visible once everything's stripped back.

Lead times on materials/specialise contractors.

Stone worktops being the big one. If other contractors can't get their work done in line with our schedule then that puts the project back.

Why the estimate can change once the work starts

This is the part homeowners find frustrating, and it's worth explaining plainly: We give a timeframe based on what's visible and what the property's age and history suggest. That estimate is real, but it's built on the information available and our experience doing this sort of work week in, week out.

Sometimes it's damp but most of the time it's poor workmanship from previous contractors or DIYers that have had a go and not done it to a satisfactory standard.

How Noko handles it when something crops up

The difference between a stressful renovation and a manageable one usually comes down to the quality of the kitchen fitter you choose. When an issue turns up mid-project, we flag it immediately, explain what it means for the timeline and the budget, and gets it fixed before building back over it. A kitchen renovation is also a chance to put right problems that would otherwise stay hidden inside the walls for another sixty years.

Questions worth asking before you commit to a start date

- Is there any known damp, subsidence, or old rewiring in the property?

- Has the floor ever been repaired or replaced in sections?

- Are any of the chosen materials bespoke or on a long lead time?

- Does the project involve moving a wall, door, or window?

Answering these honestly with your kitchen fitter narrows the estimate considerably, even if it can't remove the uncertainty completely.